Ashchurch with Walton Cardiff: Flood Risk & Resilience Event to be held in Tewkesbury on 2nd December 2014

2faf76aafe8cef3f6239595852a9fd90208ebc19For those residents and businesses who may have concerns about protecting their property, a Flood Risk and Resilience Event is being held to offer support and advice.

The event, which is being held on Tuesday, 2 December 2014 at the Watson Hall in Tewkesbury, offers people the opportunity to find out about the different grants available, and to chat through any concerns or ideas. Members of the public are invited to drop in at any time between 3pm and 5.30pm.

Representatives from the Environment Agency, Gloucestershire County Council’s Civil Protection team, Tewkesbury Borough Council, Gloucestershire Rural Community Council and the Flood Memories team from the University of the West of England will be present to provide advice and support where possible.

A free workshop will also be held between 6pm and 8pm where members of the public are invited to join in with others to put together a community emergency plan for their local area. The workshop will offer ideas and suggestions for what might work for your local area – and there will also be the opportunity to gain some practical tips.

image: bbc.co.uk

The Joint Core Strategy now reaches the Government stage this Thursday. But what happens while we wait for the Autumn 2015 Report and why wasn’t it avoided?

I would like to thank everyone who has taken the time over the last weekend and early part of this week to send e-mails to Members of Tewkesbury Borough Council concerning the Joint Core Strategy process.

The concerns raised are not lost on me in any sense. Many should have already been taken into consideration and acted upon within the JCS programme which is now being handed to the Government for final review on the 20th of November.

Many of you were hoping for change. But the very frustrating part of all this has been that the decisions that really counted were taken over a year ago.

Once a majority of Members voted the project through in early September 2013, no matter what consultations and processes have taken place since, that was basically the whole thing done and dusted, seemingly without any hope of change, unless it were to be rejected at the stage where it is submitted to the Secretary of State.

This itself is extremely unlikely. The whole JCS Process, rather like applications going through the Planning Process itself has been conducted very much as a tick-box exercise.

The modus operandi has been squarely focused upon the requirements placed upon Local Authorities by Central Government and any flexibility which might come from the interpretation which that may have allowed, has almost certainly always been used to facilitate and sure-up the three-way arrangement between Cheltenham, Gloucester and Tewkesbury which myself and other Members have long since argued has been anything but in the best interests of the people that we as Ward Councillors – and collectively as a Council – represent.

Our voices fell on deaf ears and the practical implications of what is a flawed process and three-Authority-Strategy have been manifesting in the shape of all of the ‘lightning’ developments which have either reached Application stage or are in the processes of doing so, that involve building on land which is not even included within the JCS Strategic Allocation(s). This itself is set to continue until such time as the JCS is formally approved; the Report on which is itself not due until Autumn 2015.

Put the prospect of the developments which could receive consent in the next 12 months to one side, and right around the Borough, there is clearly massive concern about the realities of rubber stamping a long-term Planning Strategy which will effectively give a green light to developers to build across a 20+ year development allocation that will see much of our beautiful landscape and Villages changed forever – when as a Borough, we are and were simply at no stage obliged to make anything remotely like such a commitment.

These kinds of concerns are no less prevalent in the Ashchurch with Walton Cardiff Ward and are probably more so. We are currently witnessing developers looking to build almost everywhere along the A46 apart from the JCS Strategic Allocation in and around the Ashchurch Camp site itself and this doesn’t consider other areas that fall behind the Camp and will no doubt have a significant impact on Northway too.

Nobody should be under any illusion that a combination of the state of the Planning System today and the avoidable time that the JCS has taken – rather than pursuing a much better and wholly expedient Policy just for the Borough – potentially makes such Applications very difficult to stop. In this specific instance alone, it now threatens the very identities of Aston-on Carrant, Aston Cross, Ashchurch and Pamington as independent communities and Villages.

People from outside both the working and political environments of Local Authorities do see the inability of the Planning System to police and enforce the very Policies they have in place, irrespective of whether it is due to the ability of a higher power to override any local decision at a higher level, or whether there simply isn’t the money available in the local public purse to pursue developers who seem to have bottomless pits for pockets where making money is concerned.

Locally, we have already witnessed one company having developed and put into use an industrial sized chicken production unit at Starveall without Planning Consent for a large part of it, once it had Consent for the initial Plan. It is more than regrettable that nobody really knows what might now lie ahead, once the JCS has been put firmly in place.

It is simply wrong that the views of local people are being ignored and where they have not spoken, that their best interests now and for the future are not being considered as they should, by all of the people who are elected to represent them.

Nonetheless, everything you all have to say and how you feel is still important, even if it doesn’t influence a decision the way you might like to see it go this time.

Keep registering your comments, objections and even support for developments – where they will benefit your Community – by contacting your Local Planning Authority and getting them recorded.

Being able to say ‘I told you so’ wont help anybody and certainly wont turn the clock back. But evidence of the strength of your feeling and the reasons why you feel that way certainly does have the ability to influence future decisions.

Better still, it could at some point help those of us who really care to change the System and benefit us all.

 

Pamington: Planning Application for 150 Homes off Pamington Lane

IMG_1453-2

I have been advised by the Planning Team at Tewkesbury Borough that an Application has been submitted and is now confirmed as valid fort he erection of up to 150 dwellings including access, landscaping, open space, and associated infrastructure with all matters reserved other than access on Land off Pamington Lane, Pamington.

The details can be found on the TBC Website using the Planning Reference 14/00972/OUT.

This is an Application which has already been discussed by many local people and I have been made aware of the views of many local Residents. Irrespective of whether we have talked about this Proposal before or not, I will be pleased to discuss any concerns that Residents may have and can be contacted by e-mail at councillor.tugwell@tewkesbury.gov.uk

As with all Planning Applications, if you wish to make your views known, the best advice I can give to everyone is to write or e-mail the Planning Department. Your view is always important and even if the result of an application turns out not to be how you would like it to have been, your input will have been put on record, and could turn out to be useful in the future.

Claydon: Planning Application for Solar Farm

Picture of a solar farm (thanks to www.telegraph.co.uk). Please note that this image is for illustrative purposes only and may not reflect either the design or aesthetics of the Proposed Development

Picture of a solar farm (thanks to http://www.telegraph.co.uk). Please note that this image is for illustrative purposes only and may not reflect either the design or aesthetics of the Proposed Development

I have been advised by the Planning Department at Tewkesbury Borough, that an Application has been received and is now confirmed as valid for an 18.2MW Solar Farm on land to the South of Claydon Farm, Claydon.

The details can be found on the TBC website using the Planning Reference 14/00785/FUL.

I will be pleased to discuss any concerns that Residents may have and can be contacted by e-mail at councillor.tugwell@tewkesbury.gov.uk

As with all Planning Applications, if you wish to make your views known, the best advice I can give to everyone is to write or e-mail the Planning Department. Your view is always important and even if the result of an application turns out not to be how you would like it to have been, your input will have been put on record, and could turn out to be useful in the future.

Wheatpieces PC to hold Parish Consultation on the future of the Multi-use Sports Field off Starling Road

photo-12

With no clear plan in place for the future, steps to put the Multi-use Sports Field into full use on the Wheatpieces 2 Development have caused great concern amongst Residents living adjacent to the Field and along Starling Road.

Wheatpieces Parish Council held an open debate with Residents who attended the June Parish Council Meeting and this followed the Council’s previous decision to ask Tewkesbury Borough Council (TBC) to begin the work necessary to make the two Football Pitches, which had always been planned, ready for use.

As a result of the discussion with those Residents present last Month, the Parish Council passed a Motion at last nights Meeting to rescind or stop the earlier decision, whilst they carry out a full Consultation across the Parish; a Plan which was also agreed by Members at this Month’s Meeting.

When I attended last Month, I was asked to follow up with Borough Officers so that the Parish Council could be fully clear on matters, before the questions for a Consultation could be decided and then written in a way which considers all of the options open to the Parish and to Residents.

The Field and MUGA (Multi-Use Games Area) are currently under the ownership of TBC, but could be adopted by the Parish. I now understand that the Field can only be used for the intended purpose of two full-sized Football Pitches and that at the current time, whilst the Parish is being and will be consulted on use, this decision ultimately rests with TBC Officers, who I also understand to have registered a need for Football Pitches in the area beyond Walton Cardiff.

Clearly, the Parish Council does not yet know how the whole Community feels about putting the Field into use for Football and they are without doubt doing the right thing by engaging Residents through a Consultation and asking everyone what they would like to happen.

However, at last night’s Meeting, I also advised the Council that it is my view that the best way for local people to influence the future of the Field most effectively will be for Wheatpieces Parish Council to adopt it from TBC. This way, the choices that need to be made now and in the future will be made as locally as they can be, and in the way that in normal circumstances you would expect them to be.

The Consultation which Wheatpieces Parish Council plans to carry out over the Summer will give all Residents the opportunity to have their say on a real issues affecting people in their own locality. I hope as many Residents as possible will be able to spare the time to take part and support the Parish Council to make its decision.

 

How much more development in Ashchurch before the traffic problems are taken seriously?

photo-13

Traffic on the A46 at Ashchurch near Junction 9 of the M5, July 2014

With the Joint Core Strategy’s (JCS) final Public Consultation Phase only having began earlier this week, it really seems quite incredible that a Developer has already began moves towards building over 500 homes and a School on the Northern side of Ashchurch Camp.

Earmarked as part of the JCS Strategic Allocation which includes the Camp, comments suggesting that the Developer concerned may have jumped the gun are already well in circulation. However, it could be asked if this Plan gives a better illustration of the approach which nearly all commercial developers are employing, and one which certainly doesn’t fit with phrases they use to describe their plans in their publicity brochures, such as ‘homes which are much needed by the community’. This does after all come hot on the heels of two other developments in the immediate vicinity which will themselves supply around 300 new homes in the Ashchurch Rural Parish – and which without the JCS being formally ‘rubber stamped’ are regrettably no less likely to go ahead.

So even without the 2000 or more homes earmarked for the Ashchurch Camp at some point between now and 2030, just this Parish alone stands to absorb the better part of a thousand homes with not even the merest hint of comparable job creation in the area of a kind which would necessitate even a fraction of this level of development in the immediate area any time soon.

Sadly, this can only lead people living around the Ashchurch with Walton Cardiff Ward to conclude that these homes – if built – will be occupied by commuters who will most likely have 2 cars per household, thereby adding around perhaps 1500 cars to either the A46, the B4079, the roads around Northway or in fact all of them each morning, evening and basically any other time.

Many Residents are already feeling dumbstruck by the quick-fire succession of opportunist Developments along the A46. With an even bigger one that nobody had expected to hear sight nor sound of until the fate of the Camp was definitely known, now on the cards, it is the realities which surround the traffic problems on the A46 which are causing universal concern.

At Monday evening’s Meeting of Ashchurch Rural Parish Council’s Planning Committee, the Developer now carrying out consultation on building 45 homes South of Ashchurch Village was more than happy that the Highways Agency had expressed no concern with regard to the impact their plans would have on the A46, despite the experiences that many of us have almost daily.

With the Representatives present stating to the Council that they had been advised their Plans would have no excessive impact on the capacity of the road network – basically an indication that Highways Officials believe the roads can take more traffic without any major change – it is perhaps little wonder that Developers are apparently falling over themselves to get their Projects built before they find themselves having to contribute to what will at some point become a very expensive process of extensive restructuring the existing Roads or building a new by-pass of some kind – if that indeed remains possible by that time.

My views and approach to the JCS are well known by Residents and I take no pleasure from seeing the chaos which this flawed Strategy is causing to Communities right across Tewkesbury Borough, even before it actually comes into being.

I, like a number of other Tewkesbury Borough Councillors made clear at a variety of points in the process that the best solution for Residents was a Strategy which focused on the Borough – not least of all because of the delays which would inevitably be caused by working with two other Authorities which themselves had much more to gain by drawing out the process for as long as it takes for them to get the best solution to their own Development problems. That unnecessarily delayed process which is being used as a significant window of opportunity by Developers continues, and it seems to be all at the cost of Residents in Tewkesbury Borough and the Ashchurch with Walton Cardiff Ward in particular.

We can only hope that when these Proposals reach the Borough Planning Committee, they are rejected on the basis of what has already been promised by this Policy, and in the case of the Development North of the Camp, held back until such time as the Community will not be expected to experience perhaps years of inconvenience and enhanced levels of danger because the infrastructure doesn’t exist that will lead to Residents experiencing otherwise.

 

 

Starveall Lane issue now resolved as new Trackway given green light…

Starveall 7I am able to confirm that Permission was granted by Tewkesbury Borough Council earlier today for the new Track or Roadway to provide access to the planned Chicken Farm at Starveall.

Furthermore, I am very pleased to confirm that the Approval has been given on the basis that we had all been hoping and working for, with Conditions in place which will see Goods Traffic to and from Starveall Farm travelling along only the most Southern part of Seven Bends and directly to and from the A435 – thereby avoiding Pamington.

Reaching this point has taken effort on the part of many and I would again like to thank Ashchurch Rural Parish Council for allowing me to speak at length to Residents and the Council at their March Meeting. This in turn has led to the dialog between Mr Hern and Mr Hill which has enabled this option to come to being materially; a solution which I believe will prove to be the best for all in the circumstances.

My thanks also go to TBC Planning Officers, who I feel have made every effort necessary to assist and give full consideration to the questions and concerns which have been raised not only by me, but also by Residents as this has progressed.

I understand that work is likely to begin on the Track or Roadway very quickly. I have also been advised that Mr Hern will be directing construction traffic in the same way as traffic will ultimately travel to Starveall Farm.

To see the Decision Notice issued today, please click below:

1400307FUL notice

Starveall Chicken Farm: Progress on referred access & related traffic route

photo 2Monday evening’s Meeting heralded a big change in approach for everyone regarding the Chicken Farm at Starveall and I would like to thanks everyone for the support that they have given with this.

We all left the Meeting of Ashchurch Rural Parish Council with the commitment that a Meeting between the relevant parties concerning the land needed to pursue the favoured option for access to and from the Chicken Farm being pushed to and from the A435 would take place.

I am pleased to say that I have today facilitated that Meeting and a deal has been agreed in principle between the two parties.

I now understand that FC Jones & Co will be submitting their Planning Application for the new access as discussed tomorrow (Thursday 3rd April).

This is fantastic news for everyone, not least of all those around the table today, and I’m sure we will all look forward with great hope that the new plans come to fruition quickly and without any unforeseen problems getting in the way.

Starveall Chicken Farm & Pamington Village: A solution to the access issues is now genuinely possible

As many of you will by now be aware, I attended the Meeting of Ashchurch Rural Parish Council this evening and took the opportunity provided by the Council for me to give my Borough Councillor’s Report to provide the following announcement and information concerning the Chicken Farm at Starveall and the use of Starveall Lane:

Starveall 10

Madam Chair, if I could beg your indulgence, the news and information that I would like to share with both the Council and those Residents present may take me a few minutes more to cover than I would normally need for normal Borough business.

I do however feel that given the very specific circumstances and nature of the matter, this is perhaps the best place and time to bring this to everyone’s attention and feel sure that in a just a few minutes time you will agree with and understand my reasons for doing so.

To all of you listening, I would respectfully ask that you let me cover all the points I have ready to give you tonight before asking questions or making comments.

I will attempt to cover all eventualities that I am aware of within what I am about to say. I will also publish the full version of this on my Blog later this evening and make a copy available to the Parish Clerk for inclusion in the Minutes of this evenings Meeting.

Madam Chair, Councillors, Ladies & Gentlemen; over recent weeks and for a good time before, it would be fair to say that there has been an incredible amount of frustration, disbelief and dare I say it, bad feeling amongst many concerning both the Plans for a Chicken Farm at Starveall, and the change in use and anticipated reconstruction of Starveall Lane.

Before I go any further with what I have to say, I must with some regret make very clear right now that whatever happens as a result of this Meeting and the content discussed herein, there is currently no Legal device or approach that any one of us can now employ that would guarantee that the construction of the Chicken Unit at Starveall itself will not go ahead.

Indeed, many of the people present have learned through the process of this specific Application that the Planning system is arguably very detached from the realities of the issues which affect local people and the localities in which they live. We would probably all agree that our experiences to date well and truly give the lie to the concept of Localism in its strictest sense.

The fact is that the Planning system is arbitrary at best and the injustices of this one-size-fits-all approach to development are amplified beyond any reasonable doubt by the indifference demonstrated by political groups and their Members within Local Authorities who now make decisions based upon what they perceive to be the inevitability of a situation, rather than giving a voice to issues which in just one situation like this one in Pamington might bring about positive changes for the many more planning applications which will affect communities across the Country to come.

It’s wrong, but it’s real and I now have to ask for you all to accept that with Planning Granted, the Chicken Farm itself will most definitely be built, and as things currently stand, Starveall Lane will be developed and all poultry related traffic will come down Pamington Lane from the A46 and then use a heavily reconstructed and covered-over Lane that has until now provided pleasure for far too many people to mention, over a period which extends way beyond the lifetimes of any person in this room.

So with this in mind, you will now most likely be wondering what cheery news I as your Borough Councillor could possibly bring to this table that would make my request for you all to come this evening in any way necessary.

I can only begin by saying that in Planning terms, rarely does the opportunity for a Community such as this to get a ‘second bite of the cherry’ after the gavel of planning-permission-granted has fallen.

Whilst the Chicken Farm itself must now be considered a fait accompli in real terms, I can now tell you all that this is not the case as far as the use of Starveall Lane is concerned.

I must in fact tell you that there is now a very real second and alternative option that I am about to table to you this evening, which has the potential to take all of the poultry related traffic well away from the Village and thereby change the whole dynamic of what has become a very dark situation that we as a community have until today faced for some weeks without any hope of change.

Some people will be historically aware that the possibility of building an access route away from the Village was originally a consideration of FC Jones & Co and the Partner taking responsibility for this Development specifically, Mr Kinsey Hern.

However at that time – which we are talking about in terms of years, rather than days or months – and I will add, somewhat understandably, there was perhaps no will on the part of anyone opposed to the plans to take any action which might in someway suggest acquiescence or indeed support for the construction of the Chicken Farm – which as I am at pains again to say is now an eventuality that we cannot in any way influence.

It was therefore perhaps always assumed thereafter, that access would depend on the use of Starveall Lane, which I now believe it fair to say has become a much bigger issue in Pamington than the Farm itself and especially so after it became clear that whilst any potential breach of the terms of the Planning could instantly be seized upon, there was in reality absolutely no way that any of us can prevent the changes coming to the Lane, unless Mr Hern should himself consider doing so, which today Ladies and Gentleman I am very pleased to be able to tell you that he and his Partners are willing to do.

I have delayed requesting the opportunity to discuss this possibility with you all until I had reached a stage through a series of discussions and meetings, where I have found myself confident beyond the balance of probability that what is now being tabled represents the very best solution for Pamington, when everything is put completely in context – something that I will now aim to do for all of you.

I will cover the points of the proposed alternative. I will then discuss the issues that this may raise. I will then consider the ways that these further issues may well be addressed and will add right now that this will actually be in ways which are certainly not located behind closed doors.

The Proposal:

1.) To seek permission to build a completely new track or roadway running East from the Chicken Farm site. Immediately beneath the Southern property boundary of Pamington Court Farm and exiting or joining the B4079 on the second of the Severn Bends as you travel North from the A435.
2.) To seek an amendment of Condition 10 of the existing Planning Permission concerning Hours of Operation from the existing 7am to 9pm for deliveries and collections excluding Sundays and Bank Holidays so that there can be:

  • Access for deliveries between 7am and 9pm Monday to Friday, 8am to 1pm Saturdays and under exceptional circumstances, that these be allowed to take place on Saturday afternoons, Sundays or indeed Bank Holidays if for any reason the feed supply chain should have broken down – for instance there is literally a break down at the feed mill which interferes with what I understand to be quite a precisely coordinated delivery and supply operation.
  • Access for collections only be given flexibility to allow for activity outside these times to include during the night. This would I understand equate to no more than 20 nights out of 365 other than in the most exceptional of circumstances.
Copyright FC Jones & Co. Diagram reproduced for information purposes only and should only be considered as a guide and not as an authoritative source. Information is subject to change.

Copyright FC Jones & Co. Diagram reproduced for information purposes only and should only be considered as a guide and not as an authoritative source. Information is subject to change.

The issues:

  • Building this track or roadway without the involvement of any other land purchase – however small, will I understand require a left-handed exit from the proposed trackway or roadway to the B4079.
  • This specific eventuality will I understand require all poultry related traffic to exit and potentially enter the site via the Eastern edge of Pamington, travelling to and possibly from Aston Cross.
  • This would inevitably lead to the poultry related traffic travelling along the Eastern fringes of Pamington Village on at least the Northern journey which essentially moves a critical aspect of the problem from one end of the Village to the other – albeit with more appropriate road access and the added dimension that lorries would be moving slower in consideration of animal welfare issues – but with the requirement and therefore acceptance of greater flexibility of the times when HGV’s would be accessing the Chicken Farm.

It is safe to say that Residents at one end of the Village will therefore be breathing a great sigh of relief at the prospect of what the proposal on the table brings. However, its coming to fruition without any adjustment would inevitably lead to as much concern – if not more – for residents at the other.

Addressing the issues:

The reality of and chronology of the events which have led us to this point are difficult to describe as they include many different perspectives and have clearly caused varying levels of distress to many Residents, which as your Borough Councillor have concerned me greatly throughout.

Indeed I regret that I was only given the opportunity to interject fully in the period immediately before the Application first went to the Borough’s Planning Committee and at a point where there was really little more that I could do but advise on what was most likely to happen given the information I had available to me at the time.

Nonetheless, I have taken every opportunity, as I might add has Councillor Gordon Shurmer who also became involved at a similar time, to explore every possibility and approach which has remained, even after Permission was granted. This itself has latterly led me into dialogue with Mr Hern and the position I find myself in here today.

Fundamentally, the proposal on the table is a better option just as it stands right now for the Village, given everything that I know and understand to date.

For this reason I would ask that you all understand that I will have to be supportive of it in the sense that if it can be achieved – it will be a far better solution and situation for the Village as a whole, rather than the conclusion which will otherwise be faced by the people in this Village who I represent.

However, I am not overlooking the very real impact that the proposal will have on Residents at the Eastern end of the Village and I have to say that somewhat thankfully, neither is Mr Hern, who both accepts, would like and is prepared to undertake the work necessary to build an entrance and exit to the proposed trackway or roadway which I understand would then require all HGV traffic to avoid the Village completely and route it to the A435, thereby removing the poultry related vehicles and the subsequent threat of noise from Pamington completely.

Image courtesy of FC Jones & Co. For information and guidance purposes only.

Image courtesy of FC Jones & Co. For information and guidance purposes only.

This however will require bridges to be built where today and for some of us present there will be very little will to do so.

To make it work, there will need to be a level of direct engagement and dialogue which rises above the personal feelings of animosity and grievance that I know and understand to exist, and recognises that there is a solution which through collaborative working and a spirit of getting the very best from this situation for everyone in the Village as it stands – can actually be achieved.

In very basic terms, this much better solution is dependent really upon just one thing.

Were it to be the case that more land were available for purchase – which is basically a relatively small triangular area at the West side of the proposed entrance and exit to the track or roadway, I have been given a commitment that subject again to the obvious approvals, FC Jones & Son would not only be willing to change the proposals for a left-hand exit from the site, they would also be happy to develop the entrance so that it is geared for HGV access and egress to the A435, and to as such take all steps necessary to make this happen.

So before I go any further, I would like to at this point make clear that I believe that if this can be achieved and gain the necessary approval, this solution should be seen as an even bigger positive step beyond the proposal already on the table, which itself should really be viewed in context as a gift to the Village when all things are considered.

Taking the proposals that one step further is akin to a quantum leap from the situation that on arrival at this Meeting, many of you will still have been expecting that the Village was guaranteed to face for the future and we would all perhaps be well served in attempting to find benefit from an appreciation of that.

For just that reason alone, I will be happy to facilitate any discussions necessary to achieve this aim on the understanding that the good will which is now clearly evident will be reciprocated on all sides and that there is a genuine desire on the part of all involved to get a solution which is genuinely the very best that we can achieve in the circumstances for everyone in Pamington.

The trade off:

The reality of this situation is that you, the Villagers want Heavy Goods Traffic kept as far away from the Village as possible and certainly off Starveall Lane, which it is safe to say that everyone wishes to be maintained and kept in it’s current state indefinitely.

On the other hand, Mr Hern appreciates this and has by his own admission stated to me that he had never anticipated that the issues surrounding Starveall Lane would create the level of animosity that it has, and which he certainly acknowledges.

On one part, Mr Hern is very keen to address this situation in the hope of moving things positively forward with you all. I do believe he is genuine in his wish to do so and to take the opportunity to address the issues over Starveall Lane whilst he is also seeking to address some of his own concerns which relate to the restriction of flexibility for what is effectively a 24/7, 365 day a year business, which may even seem less intense in terms of HGV access journeys through the area with the amendment for Hours of Operation that he would in parallel be seeking.

Beyond the stage we are here at today, Mr Hern is furthermore prepared to go the full distance – subject to the necessary support and permission being given or granted – and give us all a solution which resolves issues which otherwise and subject to the choices of people in this room, could still remain completely unresolvable.

Even the proposal as it stands is not a cheap option for FC Jones & Co financially and when all aspects of constructing a completely new trackway or roadway are considered, the financial cost will I understand be around double that which it will be to resurface Starveall Lane and place passing areas in Pamington Lane – which I must stress will remain the course of action if either alternative should for any reason prove not to be viable.

Any environmental consideration such as loss of existing hedging will be more than offset by a planned planting scheme which would cover the entire length of the new trackway or roadway and I understand this goes way beyond the expectation of what would be required in these circumstances.

However, probably one of the biggest wins as a result of seeing this proposal through is that the Applicant has made the commitment following the receipt of advice given by Tewkesbury Borough Planning Officers that in receipt of and as part of the process of Planning Permission being granted to build the track or roadway in either format, FC Jones & Co will enter into what I understand to be a commitment that would be facilitated through what is known as a Unilateral Undertaking under the Planning Act to rescind all rights of access for poultry related traffic on and along Starveall Lane.

I hope you will all agree that this is not an offer to be taken in any way lightly.

The current situation:

As we meet here tonight, I can now tell you that considerable effort has been going on behind the scenes and especially so over the past two to three weeks.

This has involved not only Mr Hern and his Advisors who I can now tell you have made considerable inroads towards these Proposals in terms of ecological surveys, land purchase and traffic surveys.

Approaches have also been made to the various Agencies with required involvement such as Gloucestershire Highways and although they would of course be consulted formally as part of the Application process which will be necessary, I understand that in principle there are unlikely to be objections to either form of the Proposal based on what is known to me at this moment in time.

The efforts to date have also involved considerable input and advice from Borough Officers who have helped me with my work on this in what have been far from day-to-day circumstances. My thanks goes to all of them for taking on board the comments and concerns that I have raised in respect of the previous Application process and the subsequent approach taken to dealing with all issues, which regrettably may not be fully apparent to all of you at this stage.

The proposal – as it stands with access travelling via the East of Pamington – is basically ready to go.

It has however been held up by Mr Hern at my request, so that I could bring this before you all today in the hope that we can together hopefully find the necessary will and means to facilitate a position where the Applicant can pursue the very best option for everyone concerned,  with access to and from the A435.

Without change and therefore your support, it is currently planned for this Proposal to be submitted this Wednesday as a full Planning Application to Tewkesbury Borough Council. On this basis you will therefore appreciate how quickly we will need to work together with Mr Hern to take the additional steps necessary and for a genuine commitment to be made to doing so in order for the process to be held up that bit longer whilst any further accommodations are dealt with and put in place for the benefit of all concerned.

Conclusion:

I have little option but to say that Pamington has what is genuinely and in effect the opportunity to get the very best possible out of a bad deal.

I know that you don’t want the Chicken Farm at Starveall, but that ship has well and truly sailed.

What we have on the table here represents what in these circumstances is the silver bullet that I know many of you and not least of all The Hill Family and Pamington Residents Association have been looking for over a period of many painful weeks and months.

I have taken the time to look at and consider all of this and even gone as far as to approach Mr Hern concerning remedies for the damage on Starveall Lane which has caused such recent levels of concern.

Even though this specific matter itself would normally be an issue for Gloucestershire Highways, given our understanding of some of those involved and the way the process works, it may take many weeks to obtain a result which could otherwise be delivered much sooner and potentially in a much more agreeable way.

I am confident that with your support, a new approach is now possible and imminently achievable which will as good as sort this one issue out in perhaps just the few days to come, whilst potentially giving everyone the sleep filled nights that I am sure you are now after as part of a much bigger and much happier solution for all.

I must conclude by stressing that nothing I have tabled here today is in any way guaranteed.

It is subject to a great many things, not least of all the support of you all in principle and throughout the necessary Legal processes which must be cleared in response to the proposals which will be made.

It will inevitably require from some of you a willingness to engage in dialogue which nobody will believe will in the first instance to be easy, but if done fairly and considerately, will benefit each and every one of the people here and within the wider community which is involved.

Without support of any kind, there remains a very good chance that Starveall Lane will soon be in use as a quasi-industrial roadway.

With just a little will and support, we might see Starveall Lane saved and traffic moved to the East of the Village.

However with all the support given that we all can possibly provide, there is a genuine chance that Starveall Lane will remain just the same, and what is more, that Pamington will never have to witness the poultry related traffic travelling to or from the Chicken Farm whilst it is built or for the period of its operation thereafter.

I can only end by asking you all most sincerely to see this opportunity for what it really is, and consider how I am sure you were all feeling about this before I began speaking.

Thank you all.

 

Update:

From the response at the Meeting there is clearly support to move forward and after initial conversations with both Mr Hill and Mr Hern, the first Meeting to discuss next stages is likely to take place in the next couple of days.

Thank you for your support.

 

 

Pamington: Chicken Farm & Starveall Lane – News Update

Starveall 7

 

Following ongoing efforts and discussions concerning the Chicken Farm and the related issues concerning the use of Starveall Lane, Pamington, I will be making an announcement and providing an update during my Borough Councillor’s slot at the Meeting of Ashchurch Rural Parish Council this coming Monday.

The Meeting of the Parish Council is open to the Public and is being held at Sherdons, Fiddington and will begin at 7.00pm. It is quite usual for the Chair of the Council to allow people who have attended for specific items of business to leave immediately afterwards and with my Agenda item usually being fairly early in the order, those attending to listen should not have to wait too long.

I look forward to seeing Residents on Monday.

Regards & best wishes,

Adam

E. councillor.tugwell@tewkesbury.gov.uk